Date | Project | Service provided to client |
August 2011 | Cúil-Aodha swimming pool refurbishment site at Cúil-Aodha, Co. Cork | Compilation of maps & drawings, planning advice, pre-planning consultation with planning authority & local authority area office, planning application (for developer) Figure 1
|
Sept 2010-July 2011 | Downhill mountain bike track facility at Knocknaboley, Hollywood, Co. Wicklow | Planning advice, compilation of maps & drawings, pre-planning consultation with planning authority, pre-planning consultation with local community, land owner negotiations, planning & retention Figure 2 |
Feb-June 2011 | Bio-energy facility at Galmoy Mines site, Galmoy, Co. Kilkenny | Compilation of EIS report (for developer) Figure 3, Figure 4, Figure 5 |
June 2011 | Cúil-Aodha hall refurbishment site at Cúil-Aodha, Co. Cork | Project management of tender competition for contract refurbishment works (for developer) |
May 2011 | Slope stability issues at Midleton WWTP extension | Review of site investigation factual report, compilation and submission of slope stability failure report |
April 2011 | Halla Béal Átha Ghaorthaidh, Ballingeary, Co. Cork | Outline property survey and report ahead of grant funding application (for developer) |
March 2011 | Snagging report for house at Bellflower Close, Forest Hill, Carrigaline, Co. Cork | Compilation of snag list (for purchaser) |
Feb-March 2011 | Waste recovery / recycling facility at Monakeeba, Thurles, Co. Tipperary | Compilation & submission of planning appeal (for waste management company / developer) Figure 6, Figure 7, Figure 8 |
Jan-Feb 2011 | Monaincha wind farm | Compilation of cost plan report for alternative site access including topographical survey, road design to turbine specification, costed bills of quantities (for developer) |
Dec 2010 | Suiomh caife oige / Youth café site at Ballymakeera, Co. Cork | Compilation of feasibility study / site screening assessment (for developer) |
May-Dec 2010 | Waste recovery / recycling facility at Monakeeba, Thurles, Co. Tipperary | Compilation & submission of further information during period of extension including traffic reports & flood risk assessment (for waste management company / developer) |
March-Dec 2010 | Bio-energy facility at Galmoy Mines site, Galmoy, Co. Kilkenny
| Compilation of facility plans including incorporation of existing mine infrastructure, planning advice, pre-planning consultation with planners & local authority staff, planning application including planning report, environmental report (for developer) |
June 2009- Dec 2010 | Suíomh Scoil Náisiúnta Chúil-Aodha & Barr dÍnse at Cúil-Aodha, Co. Cork | On-site survey & compilation of boundary maps (for owners) |
Sept 2010 | N7 Nenagh to Castletown road scheme | Attendance as expert at conciliation tranche 2 & provision of support services (for contractor) |
Aug-Sept 2010 | N7 Nenagh to Castletown road scheme | Contractual claims report including compilation of earthworks baseline programme for comparison with accelerated as-built (for contractor) |
August 2010 | Cúil-Aodha hall refurbishment site at Cúil-Aodha, Co. Cork | Compilation of conceptual refurbishment layout plans & associated cost plan ahead of grant funding application (for developer) |
July 2010 | N7 Nenagh to Castletown road scheme | Attendance as expert at conciliation tranche 1 & provision of support services (for contractor) |
July 2010 | Cúil-Aodha swimming pool refurbishment site at Cúil-Aodha, Co. Cork | Compilation of conceptual refurbishment layout plans & associated cost plan ahead of grant funding application (for developer) |
May 2010 | White River group water scheme, Gortadroma, Shanagolden, Co. Limerick | Advice on making a compliant tender under the government forms of contract, tender cost plan estimates for earthwork, drainage & services elements including geotechnical analysis, programme, tender optimisation & risk assessment (for tendering contractor) |
April 2010 | Snagging report for house at Primrose Court, Carrigaline, Co. Cork | Compilation of snag list (for purchaser) |
April 2010 | Cúil-Aodha hall site at Cúil-Aodha, Co. Cork | Compilation of boundary maps & boundary rectification (for owners) |
Sept 2009-April 2010 | Waste recovery / recycling facility at Monakeeba, Thurles, Co. Tipperary | Planning & zoning advice, compilation of maps & drawings, pre-planning consultation with planning authority & local authority area office, planning application (for waste management company / developer) |
March 2010 | Cúil-Aodha tennis courts refurbishment site at Cúil-Aodha, Co. Cork | Compilation of conceptual refurbishment layout plans & associated cost plan ahead of grant funding application (for developer) |
Sept-Nov 2009 | N7 Nenagh to Castletown road scheme | Contractual claims report on accuracy of NRA supplied topographical survey data (for contractor) |
Oct 2009 | Inchincoosh wind farm | Access road survey report including topographical survey and road design specification checking (for developer) |
Oct 2009 | N7 Nenagh to Castletown road scheme | Land registry compliant mapping in relation to land transfers where NRA lands made available insufficient (for contractor) |
May 2009 | Boggeragh Mountains wind farm | Site characterisation and percolation tests (for contractor) |
May 2009 | Little Island Sewerage Scheme, Little Island, Co. Cork | Tender cost plan estimates for earthwork, drainage & services elements including geotechnical analysis, mass haul analysis, programme, tender optimisation & risk assessment (for tendering contractor) |
April 2009 | Bombardier development, Belfast | Quantities take off & volumetric analysis (for tendering contractor) |
Jan-Feb 2009 | Development of all weather sports grounds, clubhouse and flood defences at Cúil-Aodha, Co. Cork | Flood risk assessment & response to planning authority further information request (for developer) |
Sept 2008-Jan 2009 | N21 Castleisland bypass road scheme | Tender cost plan estimates for earthworks element including geotechnical analysis, mass haul analysis, programme, tender optimisation & risk assessment (for tendering contractor) |
2008-2009 | N7 Nenagh to Castletown road scheme | Compilation of environmental impact statements (EIS) in relation to 4 no. borrow pit planning applications (for developer / contractor) |
2008-2009 | N7 Nenagh to Castletown road scheme | Compilation and submission of 50 no. approx planning exemptions, planning applications, waste facility permits & EPA submissions, in relation to quarry / borrow pit sites, waste facility sites, materials storage sites & CBM batching sites. A 100% success rate has been achieved in relation to the applications to date (for developer / contractor) Figure 9, Figure 10 |
2008-2009 | N7 Nenagh to Castletown road scheme | Earthworks mass haul revision and environmental impact assessment in tandem with value engineering design review (for contractor) |
2008-2009 | Maggies Montessori, Killarney, Co Kerry | Pre-planning consultation with planning authority & local authority area office, planning & retention planning application, door to door survey, response to planning authority further information request (for developer) |
July 2008 | Merke Sharp & Dohme enabling works, Carlow | Tender cost plan estimates for earthwork, drainage & services elements including geotechnical analysis, mass haul analysis, programme, tender optimisation & risk assessment (for tendering contractor) |
July 2008 | Offsite Roadworks at Proposed Development at Garranacanty, Tipperary Town | Cost plan estimates for procurement (for developer / contractor) |
July 2008 | Roadworks at N25 Lakeview Roundabout, Midleton, Co Cork | Cost plan estimates for feasibility & procurement (for developer / contractor) |
June 2008 | Leixlip Waste Water Treatment Plant Scheme, Leixlip, Co. Kildare | Tender cost plan estimates for earthwork, drainage & services elements featuring rock excavatibility & reusability assessments (for tendering contractor) |
2008-2009 | N7 Nenagh to Castletown road scheme | Contractual claims advice, estimates & reports (for contractor) |
August 2007-June 2008 | Development of all weather sports grounds, clubhouse and flood defences at Cúil-Aodha, Co Cork | Planning advice, pre-planning consultation, compilation of maps & drawings, pre-planning consultation with planning authority & local authority area office; compilation & submission of planning application (for developer) Figure 11, Figure 12, Figure 13 |
May 2008 | N7; Nenagh to Castletown road scheme | Split project mass haul plan and cost plan BOQs in accordance with procurement strategy, procurement cost optimisation (for contractor) |
Mar 2008 | Beckett site, Kilgarvan, Co. Kerry | Compilation of land transfer maps & land parcel sub division (for vendor) |
Mar 2008 | Waste facility at Kildorrery, Co. Cork | Flood risk assessment (for developer) |
Feb 2008 | Swimming pool site at Cúil-Aodha, Co. Cork | Compilation of boundary maps & boundary rectification (for owners) |
Jan 2008 | Mixed residential / commercial development at Citimart, Kilkenny | Tender cost plan estimates for earthworks off-site disposal element & waste management advice (for tendering contractor) |
Jan 2008 | O Callaghan retail centre scheme at Academy St. / Patrick St., Cork | Waste management advice and engineering report on contaminated soil (for contractor) |
2007-2008 | N7 Nenagh to Castletown road scheme | Coordination of detailed design team on behalf of Contractor for earthworks & drainage elements, detailed design cost plan estimates for earthworks, drainage & services elements including geotechnical analysis, mass haul optimisation, programme, & budget optimisation (for contractor) |
Sept 2007 | New Quarter mixed residential / commercial development, Athenry, Co. Galway | Tender cost plan estimates for earthworks element including geotechnical analysis, mass haul analysis, programme, tender optimisation & risk assessment (for tendering contractor) |
Sept 2007 | N7 Nenagh to Castletown road scheme | Tender cost plan estimates for earthworks element including geotechnical analysis, mass haul analysis, programme, tender optimisation & risk assessment (for tendering contractor) |
Aug 2007 | N8 Mitchelstown to Fermoy road scheme | Tender cost plan estimates for earthwork, drainage & services elements including geotechnical analysis, mass haul analysis, programme, tender optimisation & risk assessment (for tendering contractor) |
Aug 2007 | N9 Phase 3 Kilcullen to Carlow road scheme | Tender cost plan estimates for earthwork, drainage & services elements including geotechnical analysis, mass haul analysis, programme, tender optimisation & risk assessment (for tendering contractor) |
June 2007 | Midleton Northern Relief Road Phase 1, Midleton, Co. Cork | Tender cost plan estimates for earthwork, drainage & services elements including geotechnical analysis, mass haul analysis, programme, tender optimisation & risk assessment (for tendering contractor) |
Nov 2006-June 2007 | Development of all weather sports grounds, clubhouse and flood defences at Cúil-Aodha, Co Cork | Feasibility study (for developer) |
March 2007 | Wicklow Port Access & Town Relief Road, Wicklow | Tender cost plan estimates for earthwork, drainage & services elements including geotechnical analysis, mass haul analysis, programme, tender optimisation & risk assessment (for tendering contractor) |
Feb 2007 | Dundrum Phase 2 Shopping Centre | Rock excavatibility assessments & cost estimate (for tendering contractor) |
Feb 2007 | Residential development at Kill, Co. Waterford | Value engineering, cost optimisation, sub-contractor vetting (for developer / contractor) |
Jan 2007 | Thornton Hall Prison, Co. Dublin | Tender estimates for earthworks & drainage elements (for tendering contractor) |
2007-2009 | Slatty Lake & Bridge flooding issues, Carrigtohill, Co Cork | Planning objections & appeals, client representation, site inspection, engineering advice, expert witness at high court proceedings (for plaintiff) |
Nov 2006 | Terminal 2 Dublin Airport enabling works, Co. Dublin | Tender cost plan estimates for earthwork, drainage & services elements including geotechnical analysis, mass haul analysis, programme, tender optimisation & risk assessment (for tendering contractor) |